eServ Home
About eServ
eServ History
Our Customers
The eServ Difference
Lean Engineering
Methodology
eServ eOps Center
eServOnline
Competency Centers
Manufacturing Engineering
Mechanical Design & Analysis
Electrical Engineering
Aerospace Engineering
Project Experience
New Product Introduction
Cost Savings
Redesign
News
Contact Us
Manufacturing Engineering
Industry Solutions
Services & Capabilities
SAP Solutions
Case Studies
Mechanical Engineering
Case Studies
Embedded Engineering
Case Studies
Engine Support
Case Studies
Recent News & Press
BMW launches DriveNow, the 'premium' car sharing service with a Dell Streak on every dash (video)
Read more
News & Events>
Success Stories - Manufacturing
Lean Manufacturing - Waste Elimination
Problem Statements
Production requirements were past the capacity of existing welding process
Many forms of waste were present in the existing process from fit up to final welding
All welding was done manually
Quality issues with purchased parts
Support was needed to facilitate and execute Kaizen and 5S activities
Solution
Reduced the inventory clutter and travel to part shelves
Eliminated excess parts
Removed unneeded shelves and racks
Improved ergonomics of fit up fixture by eliminating all twisting action clamps
Vendor agreed to fix all part related problems
Drafted Production Scoreboard, Visual Metrics
Facilitated procurement and implementation of Robotic Welder
Results
45 operation steps decreased to 29 -
36% Improvement
28 minute cycle time decreased to 16 minutes -
43% Improvement
260 footsteps by operator decreased to 147 -
43% Improvement