Success Stories - Manufacturing

Process Engineering - Cost Reduction

Problem Statement

  • Need to reduce piece part cost in wheel loader transmission components

Solution

  • Reviewed part for design modifications based on manufacturing method chosen:
    • Modified CAD model(s) for geometry changes
    • Overlay modified part on existing assembly to ensure continued fit and function
    • Perform FEA analysis as confirmation of continued or enhanced product performance based on geometry modifications & manufacturing method
  • Evaluated cost benefits of alternate manufacturing process:
    • Part costs of cost reduction concept vs. current part cost & manufacturing methodology
    • ROI of initial capital costs based on part cost savings percentage

Results (examples)

  • Part 1:
    • ROI of 31 weeks on capital investment (tooling) to alternate process - ROI target <52 weeks
    • Net savings of 72% in piece part price without loss of part integrity or functionality
  • Part 2:
    • ROI of 37 weeks on capital investment (tooling) to alternate process - ROI target <52 weeks
    • Net savings of 75% in piece part price without loss of part integrity or functionality